CM at risk public bid project of turnkey Concrete Construction for a 98,000 SF building housing the emergency communications center, emergency operations center, and primary data center for the City of Raleigh. The project consisted of a large partial basement with full height walls around 3 sides. Large foundations supported 3 shear wall towers reaching 110’ tall. Basement walls were formed using a wood gang system and the shear towers were formed using a Formtech steel and aluma beam system. The building also required IQ to construct a unique system for vapor intrusion mitigation system due to the presence of contaminated soils beneath adjacent properties.
Raleigh, NC
Clark Nexsen Architecture and Engineering
Stewart Engineering
Clancy and Theys / Balfour Beatty Joint Venture
11/30/2015